A practical sequence keeps drawings, materials, production inputs, and inspection points visible from review through dispatch.

Production flow

Drawing review starts the manufacturing conversation.

Requirements are confirmed before order-specific production is scheduled.

  1. 01

    Drawing review

    Review geometry, interfaces, quantity, and application requirements.

  2. 02

    Material selection

    Confirm material and surface direction for the order.

  3. 03

    Sample confirmation

    Coordinate a sample when the confirmed order process requires one.

  4. 04

    Production

    Schedule order-specific work after requirements are confirmed.

  5. 05

    Inspection

    Check output against the agreed order requirements.

  6. 06

    Shipment

    Coordinate packing and dispatch details for the confirmed order.

Wide view of the Wanfan manufacturing workshop

Verified production context

≈3,000 m² facility and ≈50 machines.

The typical production window is 5–15 days, subject to order confirmation. Scheduling depends on confirmed configuration, quantity, and current production planning.

Facility area
≈3,000 m²
Production equipment
≈50 machines
Typical window
5–15 days, subject to order confirmation

Start with requirements

Send a drawing for production review.

Include dimensions, material direction, quantity, application, and target delivery context.

Request a Quote